Case Study 3: Utility Assessment Report for a Proposed Care Home

A developer planning a new care home required a comprehensive utility assessment report as part of their planning submission. The report needed to outline the existing infrastructure, potential constraints, and opportunities for future connections. By analysing all affected utilities, engaging with network providers, and compiling a detailed, site-specific report, the developer was able to demonstrate […]

Case Study 2: Securing Temporary Builders’ Supplies for a 150-Home Development

For a 150-home development, securing temporary electric and water connections early in the project was critical to keeping the construction timeline on track. An application was submitted, and the process was managed to ensure timely approvals from the network providers. By overseeing the applications, liaising with providers, and ensuring the correct specifications were met, the […]

Case Study 1: Enabling Development Progress Despite a Restricted Point of Connection

A large housing development comprising 1,600 homes and commercial units faced a critical challenge when the local Distribution Network Operator (DNO) provided a restricted Point of Connection (PoC). The site’s energy demands required significant network reinforcement, which risked long delays and potential demobilisation of the development team. Through extensive negotiation and technical engagement with the […]