A developer planning a new care home required a comprehensive utility assessment report as part of their planning submission. The report needed to outline the existing infrastructure, potential constraints, and opportunities for future connections.
By analysing all affected utilities, engaging with network providers, and compiling a detailed, site-specific report, the developer was able to demonstrate due diligence to planning authorities. This ensured that utility considerations were properly accounted for within the overall development plan.
Key Outcomes:
✔ Comprehensive assessment of all utility constraints and opportunities.
✔ Provided a structured report that formed part of the planning submission.
✔ Strengthened the developer’s case for approval by demonstrating proactive planning and risk mitigation.